Piping Stress Analysis_TGDP

2010. 11. 4. 12:49 from 설계
TURKMENGAS "TGDP Project" at Yoloten in Mary, Turkmenistan.
  -. Gas Desulfurization Plant Project
  -. Client : HEC.
  -. Owner : State Concerned Turkmengas.
  -. Term of Service : Mar. 2010 - Jan. 2011

Turbo Expander Compressor Line Stress Analysis by CAESAR II 5.20
  -. NPS : Suction 20", Discharge 18"
  -. Design Temp. : Max. 85℃, Min. -34℃.
  -. Pressure Rating : 600#



'설계' 카테고리의 다른 글

Basic Stress Theory  (0) 2010.11.19
Heat Exchanger  (0) 2010.11.11
Piping Stress Analysis_HDO #2 HOU  (0) 2010.10.03
Piping Stress Analysis_MMA  (0) 2010.09.10
Piping Stress Analysis_KCC P2  (0) 2010.07.20
Posted by Chorl.Jeong :