Piping Stress Analysis_HDO #2 HOU

2010. 10. 3. 02:00 from 설계
Hyundai Oilbank "HDO #2 HOU Project" at Daesan town in Seosan city, Korea.
  -. Heavy Oil Upgrading Plant Project
  -. Client : HEC.
  -. Owner : HDO (Hyundai Oilbank)
  -. Term of Service : Mar. 2009 - Feb. 2010

Vertical Pump with Column Line Stress Analysis by CAESAR II 5.10
  -. NPS : Suction Nozzle 14", Discharge Nozzle 10"
  -. Design Temp. : 391℃ (Operating Temp. : 363℃)
  -. Pressure Rating : 900#