Hyundai Oilbank "HDO #2 HOU Project" at Daesan town in Seosan city, Korea.
-. Heavy Oil Upgrading Plant Project
-. Client : HEC.
-. Owner : HDO (Hyundai Oilbank)
-. Term of Service : Mar. 2009 - Feb. 2010
Vertical Pump with Column Line Stress Analysis by CAESAR II 5.10
-. NPS : Suction Nozzle 14", Discharge Nozzle 10"
-. Design Temp. : 391℃ (Operating Temp. : 363℃)
-. Pressure Rating : 900#
-. Heavy Oil Upgrading Plant Project
-. Client : HEC.
-. Owner : HDO (Hyundai Oilbank)
-. Term of Service : Mar. 2009 - Feb. 2010
Vertical Pump with Column Line Stress Analysis by CAESAR II 5.10
-. NPS : Suction Nozzle 14", Discharge Nozzle 10"
-. Design Temp. : 391℃ (Operating Temp. : 363℃)
-. Pressure Rating : 900#
'설계' 카테고리의 다른 글
Basic Stress Theory (0) | 2010.11.19 |
---|---|
Heat Exchanger (0) | 2010.11.11 |
Piping Stress Analysis_TGDP (0) | 2010.11.04 |
Piping Stress Analysis_MMA (0) | 2010.09.10 |
Piping Stress Analysis_KCC P2 (0) | 2010.07.20 |