Piping Stress Analysis_HDO #2 HOU
Chorl.Jeong
2010. 10. 3. 02:00
Hyundai Oilbank "HDO #2 HOU Project" at Daesan town in Seosan city, Korea.
-. Heavy Oil Upgrading Plant Project
-. Client : HEC.
-. Owner : HDO (Hyundai Oilbank)
-. Term of Service : Mar. 2009 - Feb. 2010
Vertical Pump with Column Line Stress Analysis by CAESAR II 5.10
-. NPS : Suction Nozzle 14", Discharge Nozzle 10"
-. Design Temp. : 391℃ (Operating Temp. : 363℃)
-. Pressure Rating : 900#
-. Heavy Oil Upgrading Plant Project
-. Client : HEC.
-. Owner : HDO (Hyundai Oilbank)
-. Term of Service : Mar. 2009 - Feb. 2010
Vertical Pump with Column Line Stress Analysis by CAESAR II 5.10
-. NPS : Suction Nozzle 14", Discharge Nozzle 10"
-. Design Temp. : 391℃ (Operating Temp. : 363℃)
-. Pressure Rating : 900#